Sunday, March 2, 2008

Week #3

Hours: 24
Sorry about the blogs not going in order, but i need to post this one. So on the third day i did imy intership i went to Michael's office and did more drawing. These consisted of the preliminary drawings for the the garage, and the side stair well of my house. I was asked to get a lot of measurements for those two parts of the building so we could do the real drawings in the fourth week (which we did).

No comments: