Tuesday, March 18, 2008

Week #6

We've finally begun to work on the 1/4 scale model of my house. The work on the model is much faster than the drawing as I've already cut out both the side walls of my house, and the entire upper floor plan. As of now floor slants to the left, but we'll fix that. My house is built on a slope so one side wall is shorter than the other. To counteract this we need to build a base and stack the cardboard for the house to sit on.

No comments: